Skip to main content

Posts

Showing posts from 2015

Professional Engineer (PE) Assignee Service (Night Shift)-Offer up to Dec 31 2022

Offer! We provide Professional Engineer (PE) Assignee Service (Night Shift)-Offer up to Dec 31, 2022. Great deal. Contact 82248216, 91520892 by call/sms/whatsapp/wechat for details. For rail safety and protection safety area lifting, crane operation, piling equipment operation etc in 1st/2nd/3rd reserve line only. Full time standing supervision, charge as per trip/hourly/daily/shift.

Professional Engineer (PE) /PE Assignee Service (Night Shift)-https://form.123formbuilder.com/6931374/

1. Key Requirements for LTA RPZ AIP   The Land Transport Authority (LTA) Approval-in-Principle (AIP) for pile design and pile layout plans is a critical regulatory requirement for construction projects within the Railway Protection Zone (RPZ) in Singapore. The RPZ is generally defined as land within 40m of any rapid transit system (RTS) structure.   Approval Trigger: Any pile foundation installation (bored piles, driven piles) within the RPZ requires prior approval from LTA. Submission Channel: Under the new CORENET X framework, this is part of the Piling Gateway (optional) or as part of the Design/Construction Gateway. Key Documents Required:   Engineering Assessment Report: Prepared by a Qualified Person (QP), detailing the impact of piling on existing MRT structures. Detailed Pile Layout Plan: Showing pile locations, diameters, and distances from MRT structures. Method Statement: Outlining the construction method (e.g., vibration-free piling methods...

offer! RTO service for manhole construction

Usually, manhole construction shall be overseen by qualified site supervisors including professional engineers, resident engineers or resident technical officers.  For projects not more than seven and half million, at least one site supervisor is requested by building regulation. We can help you supervise your manhole works. Contact us at 82248216, 91823106  or email: hr@lem.com.sg if you have any inquiry.

Covering site supervisor service-to provide stand-in supervision service as RTO,RE,PE Assignee, PE/QP representative,email:lemgmt2011@gmail.com

We provide 1)Covering/Relief/Part-time Resident Technical Officer-RTO supervision service 2) Covering/Relief/Part-Time Resident Engineer-RE supervision service 3) Professional Engineer (PE) or PE representative supervision service 4) LTA Professional Engineer assignee service For crane hoisting, piling, building, civil  & architectural works.

Provide Full Time Professional Engineer (PE) Assignee Supervision Service https://form.123formbuilder.com/6931374/

1. Key Requirements for LTA RPZ AIP   The Land Transport Authority (LTA) Approval-in-Principle (AIP) for pile design and pile layout plans is a critical regulatory requirement for construction projects within the Railway Protection Zone (RPZ) in Singapore. The RPZ is generally defined as land within 40m of any rapid transit system (RTS) structure.   Approval Trigger: Any pile foundation installation (bored piles, driven piles) within the RPZ requires prior approval from LTA. Submission Channel: Under the new CORENET X framework, this is part of the Piling Gateway (optional) or as part of the Design/Construction Gateway. Key Documents Required:   Engineering Assessment Report: Prepared by a Qualified Person (QP), detailing the impact of piling on existing MRT structures. Detailed Pile Layout Plan: Showing pile locations, diameters, and distances from MRT structures. Method Statement: Outlining the construction method (e.g., vibration-free piling methods...