Skip to main content

Posts

InterNachi and NEA approved Vector Control Inspector Service https://form.123formbuilder.com/6931374/

  Le Management (2011) Pte Ltd is a Singapore NEA-licensed pest control and management inspector, as well as accredited by InterNACHI as a Wood Destroying Organism Inspector (WDO). Not only can we disinfect your office and workplace by delivering a broad-spectrum disinfection misting service, targeting both surfaces and inaccessible areas but we can also healthy home monitoring. Regular disinfection services and monitoring should form part of your action plan to prevent the spread of harmful bacteria and viruses. Our expert selection of broad-spectrum disinfectants enables us to quickly sanitize large areas, achieving maximum effectiveness and minimal downtime for your home and business. The disinfectants we utilize are the same industrial-grade, safety-rated ones selected by governments worldwide for Emergency Disease Control and are listed in the biosecurity guides of the United Nations Food and Agriculture Organization. Our disinfectant has a broad-spectrum, non-selective range ...
Recent posts

Helideck, Helipad and Heliport Inspections and Certification (CAP 1264, CAP 437,IOGP 322, 1264 CAAP 92-4, ASG 904 and ICAO Annex 14) https://form.123formbuilder.com/6931374/

The helicopter landing area including heliport, helipad, and helideck survey and certification service covers all important aspects of the helicopter landing certification as per IOGP322, CAP 1264, CAP 437, CAAP 92-4, ASG 904 and ICAO Annex 14, such as the physical characteristics of the platform and lighting, the rescue and fire fighting equipment, the refueling system, and a thorough review of the operational and quality processes. Our report covers all important aspects of the friction survey and safety perimeter net drop test on your helideck/helipad/heliport. It gives a clear overview of the required corrective actions and full photographic coverage. With a global fleet of fully CAA CAP 1264, CAA CAP437, CAAP 92-4,  ASG 904 and ICAO Annex 14  compliant helideck friction testers, we are able to perform an annual friction test on any helideck surface, such as: Flat helideck surfaces with a micro-texture finish Profiled helideck surfaces, typically constructed from extruded ...

Singapore leading LTA site supervisor service provider -LTA.PROMPT site supervisor supply service. https://form.123formbuilder.com/6931374/

1. Key Requirements for LTA RPZ AIP   The Land Transport Authority (LTA) Approval-in-Principle (AIP) for pile design and pile layout plans is a critical regulatory requirement for construction projects within the Railway Protection Zone (RPZ) in Singapore. The RPZ is generally defined as land within 40m of any rapid transit system (RTS) structure.   Approval Trigger: Any pile foundation installation (bored piles, driven piles) within the RPZ requires prior approval from LTA. Submission Channel: Under the new CORENET X framework, this is part of the Piling Gateway (optional) or as part of the Design/Construction Gateway. Key Documents Required:   Engineering Assessment Report: Prepared by a Qualified Person (QP), detailing the impact of piling on existing MRT structures. Detailed Pile Layout Plan: Showing pile locations, diameters, and distances from MRT structures. Method Statement: Outlining the construction method (e.g., vibration-free piling methods...

Supply of the BCA Periodic Facade Inspection (PFI) Service-CP & FI

  Periodic Facade Inspection (PFI) The Periodic Facade Inspection (PFI) regime was introduced in 2020 to enhance maintenance of building facades, for public safety. Frequency of Inspection Buildings that are more than 20 years of age are to be inspected every 7 years with the exception of: - Detached houses, semi-detached houses, terraced or linked houses which are used solely as places of residence - Temporary buildings - Buildings where the highest point (including its roof, if applicable) is 13 metres or lower when measured from the ground. Periodic Facade Inspection (PFI) Process 1. BCA informs owner* by serving a Notice for PFI of buildings 2. Owner appoints a Competent Person^ (CP) 3. CP conducts a facade inspection of the building 4. Owner or CP (authorised by owner) submits a report to BCA 5. Where necessary, owner engages a contractor to repair defects as recommended by the CP *Owner as defined under s26(1) of the Building Control Act ^CP can either be a professional engin...

Singapore leading certified Fire Safety Managers (FSM) service

We are Singapore leading FSM supplier to provide certified Fire Safety Managers (FSM) to local industries. As per regulation, buildings that satisfy at least one of the following conditions need a qualified FSM,   1. Public Building (inclusive of Commercial Building) is of 9 stories or more (including any basement) in height; or is used, constructed or adapted to be used as a hospital; or has a floor area of 5000 square meters or more; or has an occupant load of 1,000 persons or more. 2. Industrial Building has a floor area or site area of 5000 square meters or more or has an occupant load of 1,000 persons or more.    Our Fire Safety Manager will advise building owners on compliance to legislation related to fire safety and maintaining a fire-safe building for all occupants through regular inspections to identify fire hazards. We offer comprehensive fire safety management services to assist building/premise owners and operators to fulfill the regulator...

We provide freelance FSM-registered Fire Safety Manager service and consultancy

We provide the freelance Registered Fire Safety Manager (FSM) service to ensure and enhance the fire safety standard of the buildings.   Through the FSM-Fire Safety Manager, fire safety activities and fire prevention measures shall be implemented to promote fire safety awareness among the building occupants. Engagement of a Fire Safety Manager will help owners of buildings prevent substantial monetary and life losses resulting from fires. The FSM scheme was offered to help compliance with the Fire Safety Act 1993 and the Fire Safety (Fire Safety Manager) Regulations 2007. The Act and regulation have become mandatory for owners of designated buildings to appoint Fire Safety Managers.   1) Registered Fire Safety Manager 2)Formulation of Emergency Response Plan 3) Fire Drills and Table Top Exercise 4) Fire Certificate Renewal 5) Fire Safety Committee 6)Fire Safety Audits and Inspections You may contact us @ 82248216, or Email: lemgmt2011@gmail.com . All enquiries welcome...

Offer! We provide LTA safety zone standing and/or full time PE/PE ASSIGNEE SERVICE https://form.123formbuilder.com/6931374/

1. Key Requirements for LTA RPZ AIP   The Land Transport Authority (LTA) Approval-in-Principle (AIP) for pile design and pile layout plans is a critical regulatory requirement for construction projects within the Railway Protection Zone (RPZ) in Singapore. The RPZ is generally defined as land within 40m of any rapid transit system (RTS) structure.   Approval Trigger: Any pile foundation installation (bored piles, driven piles) within the RPZ requires prior approval from LTA. Submission Channel: Under the new CORENET X framework, this is part of the Piling Gateway (optional) or as part of the Design/Construction Gateway. Key Documents Required:   Engineering Assessment Report: Prepared by a Qualified Person (QP), detailing the impact of piling on existing MRT structures. Detailed Pile Layout Plan: Showing pile locations, diameters, and distances from MRT structures. Method Statement: Outlining the construction method (e.g., vibration-free piling methods...

Professional Engineer (PE) Assignee Service (Night Shift)-Offer up to Dec 31 2022

Offer! We provide Professional Engineer (PE) Assignee Service (Night Shift)-Offer up to Dec 31, 2022. Great deal. Contact 82248216, 91520892 by call/sms/whatsapp/wechat for details. For rail safety and protection safety area lifting, crane operation, piling equipment operation etc in 1st/2nd/3rd reserve line only. Full time standing supervision, charge as per trip/hourly/daily/shift.

Professional Engineer (PE) /PE Assignee Service (Night Shift)-https://form.123formbuilder.com/6931374/

1. Key Requirements for LTA RPZ AIP   The Land Transport Authority (LTA) Approval-in-Principle (AIP) for pile design and pile layout plans is a critical regulatory requirement for construction projects within the Railway Protection Zone (RPZ) in Singapore. The RPZ is generally defined as land within 40m of any rapid transit system (RTS) structure.   Approval Trigger: Any pile foundation installation (bored piles, driven piles) within the RPZ requires prior approval from LTA. Submission Channel: Under the new CORENET X framework, this is part of the Piling Gateway (optional) or as part of the Design/Construction Gateway. Key Documents Required:   Engineering Assessment Report: Prepared by a Qualified Person (QP), detailing the impact of piling on existing MRT structures. Detailed Pile Layout Plan: Showing pile locations, diameters, and distances from MRT structures. Method Statement: Outlining the construction method (e.g., vibration-free piling methods...

offer! RTO service for manhole construction

Usually, manhole construction shall be overseen by qualified site supervisors including professional engineers, resident engineers or resident technical officers.  For projects not more than seven and half million, at least one site supervisor is requested by building regulation. We can help you supervise your manhole works. Contact us at 82248216, 91823106  or email: hr@lem.com.sg if you have any inquiry.

Covering site supervisor service-to provide stand-in supervision service as RTO,RE,PE Assignee, PE/QP representative,email:lemgmt2011@gmail.com

We provide 1)Covering/Relief/Part-time Resident Technical Officer-RTO supervision service 2) Covering/Relief/Part-Time Resident Engineer-RE supervision service 3) Professional Engineer (PE) or PE representative supervision service 4) LTA Professional Engineer assignee service For crane hoisting, piling, building, civil  & architectural works.

Provide Full Time Professional Engineer (PE) Assignee Supervision Service https://form.123formbuilder.com/6931374/

1. Key Requirements for LTA RPZ AIP   The Land Transport Authority (LTA) Approval-in-Principle (AIP) for pile design and pile layout plans is a critical regulatory requirement for construction projects within the Railway Protection Zone (RPZ) in Singapore. The RPZ is generally defined as land within 40m of any rapid transit system (RTS) structure.   Approval Trigger: Any pile foundation installation (bored piles, driven piles) within the RPZ requires prior approval from LTA. Submission Channel: Under the new CORENET X framework, this is part of the Piling Gateway (optional) or as part of the Design/Construction Gateway. Key Documents Required:   Engineering Assessment Report: Prepared by a Qualified Person (QP), detailing the impact of piling on existing MRT structures. Detailed Pile Layout Plan: Showing pile locations, diameters, and distances from MRT structures. Method Statement: Outlining the construction method (e.g., vibration-free piling methods...